July Newsletter

July Vol newsletter 2015 pg 1

July Vol newsletter 2015 pg 2

Advertisements

May & June

Even with the massive undertaking of the community hall steps project we still managed to get up to a thing or two else in May in between waiting for the wood to be cut or delivery of gravel etc….

IMG_1314  IMG_1312

IMG_1315  IMG_1320

Bridge repairs

IMG_1378

Signage

IMG_1382  IMG_1388

More hedge work

IMG_1456  IMG_1457  IMG_1468

More coloured route marking

IMG_1459

To finish off May, there is nothing like playing in the mud!

June 

IMG_1460  IMG_1462  IMG_1464

Kicking off June with a bit more drainage work and playing with more mud!

IMG_1486  IMG_1487

Clearing round trees planted out in February.

IMG_1497 IMG_1498

Completion of the massive hedge trimming!

IMG_1505  IMG_1503

Clearing back the forestry roadside and saving some alders that were trying to make themselves at home in the middle of the road!

Community hall steps project

May brought on some fleeting sunshiny days and a whole load more rain! However we did manage to achieve a lot of tasks and got very at one with the mud! The main task for May was to build steps into a slope outside the community hall. There is a fire pit of which at events a fire is lit and throughout the night what is seen in the first picture as a grassy slope, this small hillside outside the hall becomes a lethal mud slide once fifty or more folk start walking up and down it. Large steps seemed to be the best option so with a fair bit of measuring and head scratching a plan was hatched and a starting line could be marked out. There was a fair few hiccups and delays along the way and a deadline of an island wedding at the end of the month which kept it all exciting and slightly stressful factors along the way. The hall had also been hired by Right Lines Productions for two weeks of rehearsals of Rapid Departure which involved getting their songs stuck in our head and the inclusion of some funny characters appearing in amongst our mud, see if you can spot one in the pictures below! Nonetheless with the determined efforts,  full devotion to the project and slight hysteria at times (!) the volunteers gave 150% and the finest steps were built, all in time for the wedding, just!

IMG_1326

Before

IMG_1337

Digging has begun… but what is that by the hall in yellow!?!

IMG_1351

1st step dug and a whole load of mud! Starting to take shape though.

IMG_1347

Large stones preventing progress…the only way was to dig them out!

IMG_1354

A WELL needed rest after a serious amount of digging, removing rocks/boulders (!) and shifting the excess soil and maybe a mild panic that I had pushed volunteers a bit to hard and no more work would take place!

IMG_1391

The long awaited planks of wood arrived, cut by Bob and his woodmizer on Eigg from a windblown Douglas Fir and with a fair bit of sweat, was cut by hand to size! This was after a mathematical nightmare, a lot of measuring, checking again, marking out the steps once again, and then maybe again to be ABSOLUTELY sure before the first piece was cut as we only had the exact amount of planks with not a millimetre to spare!

IMG_1397

Looking good! A few days of dry weather helped tremendously…

IMG_1415

Back to rain and squelchy mud! Fence posts were banged in to keep the wooden steps in place. A few more stones had to be removed….

IMG_1417

Delivery of the long, long, lost then found again, looong, awaited for gravel ! Only to find when we opened the bags it was bright orange and reminded me of cheesy wotsits!! By this point the wedding decor just had to fit in with the new cheesy wotsit theme! You will be glad to know that after a few larger events and a bunch more rain it has started to dull down…a bit! We then had to go and source some gravel already on the island as we didn’t have enough cheesy wotsit gravel! We were up to Wednesday by this point and the wedding was on Saturday, talk about cutting it fine!

IMG_1399

Hysteria had set in, the ‘Eigg measure’ was being used (water level prop from the play) to try and figure out step depth and levels…. 2 Eiggs worth for each step!

IMG_1441

Back to serious stuff…Some ‘normal’ coloured gravel we managed to beg and borrow on the island but did mean hand shovelling it onto the trailer and then back off at the other side. More back breaking work!

IMG_1448

An arty farty triangle and I think we may have a missing volunteer, anyone seen them!?!

IMG_1439

The finished steps!!

IMG_1450

One mighty team of volunteers, L to R – Jake, Maddie and Andrew!! Not forgetting to mention Ed who started the project but was gutted to have to leave and miss the completion party! And look, the steps double up as seats just as well we measured it to the two Eigg’s worth!

 

Spring was trying to be sprung

April, despite the weather tried its hardest to be spring. The birds made their best attempts at nesting, the cuckoo started cuckooing, the wild garlic made a mighty appearance  and the volunteers chirped away! By mid April we were up to three of the finest ladies to spend time with, we covered many tasks over the weeks along with many of life’s topics, laughed (a lot!) and even was quiet enough at times to appreciate the bird song and a flutter of an early butterfly and the buzz of the bees. A favourite day for April has to be building steps into a steep incline on a woodland path. We spent a couple of days with the assistance of Dean to keep us right, sunshine and the almighty aroma of the wild garlic!

IMG_1280  IMG_1281IMG_1289IMG_1290IMG_1293IMG_1294IMG_1394IMG_3361